Power off for 6 times using a physical switch, and the power off time is 1-5 seconds each time, And ensure that the power is on for the sixth time. After the reset is successful, the lamp will be on and off for 2 times, and then it will be on normally, the distribution network state can be entered. The distribution network end light flashes twice, indicating that the network connection is successful.